Impact assessment MONITORING AIR QUALITY AND DUST ON THE HS2 PHASE ONE ROUTE (MAY 2019) Monthly air quality monitoring reports for HS2, taken within local authorities along the Phase One
(London to West Midlands) route. Get emails about this page DOCUMENTS BIRMINGHAM AIR QUALITY REPORT (MAY 2019) PDF, 1.33 MB, 15 pages BRENT AIR QUALITY REPORT (MAY 2019) PDF, 2.64 MB, 9
pages CAMDEN AIR QUALITY REPORT (MAY 2019) PDF, 5.16 MB, 22 pages EALING AIR QUALITY REPORT (MAY 2019) PDF, 3.34 MB, 13 pages HAMMERSMITH AIR QUALITY REPORT (MAY 2019) PDF, 2.01 MB, 12 pages
HILLINGDON AIR QUALITY REPORT (MAY 2019) PDF, 4.24 MB, 13 pages KENSINGTON AIR QUALITY REPORT (MAY 2019) PDF, 1 MB, 7 pages NORTH WARWICKSHIRE AIR QUALITY REPORT (MAY 2019) PDF, 632 KB, 9
pages THREE RIVERS AIR QUALITY REPORT (MAY 2019) PDF, 402 KB, 8 pages WESTMINSTER AIR QUALITY REPORT (MAY 2019) PDF, 2.99 MB, 8 pages DETAILS The reports contain monitoring data and
interpretative results, including a summary of the construction activities occurring. This covers any complaints received, data recorded over the monitoring period, any periods which
exceeded agreed trigger levels and the results of any investigations. Where High Speed Two (HS2) works have been identified as the source, the reports include actions taken to resolve the
issue and to prevent a recurrence. HS2 Ltd and its contractors are required to undertake air quality and dust monitoring, and produce monthly reports, to comply with the Code of Construction
Practice (CoCP). The reports are specific to each local authority area along the Phase One route. The CoCP forms part of the Environmental Minimum Requirements (EMRs). The EMRs set out
high-level environmental and sustainability commitments to be carried out during the planning and implementation of works along the Phase One route. UPDATES TO THIS PAGE Published 22 July